Elba will soon have new sidewalks and underground utilities (telephone, electric and cable wires will all be underground and new lighting on the streets around the court house area. It will be beautiful when this is completed in July 2008. Construction began mid April and they have 90 days to complete it - which is mid July. I am posting some photos takenMonday (April 28); one side of the sidewalks has already been taken up and just today they put the utilities on the ground and covered them with cement. I guess tomorrow they will put more cement and finish up the north side.The old sidewalks were high off the street a
nd you had to take steps to get up to the sidewalk. Car bumpers were always hitting the high sidewalk bank. With the new sidewalks, a section closest to the street will be lowered to avoid cars hitting them, and then you step up one step to the sidewalk near the buildings. In the center of each sidewalk, near the street, there will be small green spaces with shrubs and flowers.
nd you had to take steps to get up to the sidewalk. Car bumpers were always hitting the high sidewalk bank. With the new sidewalks, a section closest to the street will be lowered to avoid cars hitting them, and then you step up one step to the sidewalk near the buildings. In the center of each sidewalk, near the street, there will be small green spaces with shrubs and flowers.
You can see in the photo here of the old Elba Exchange Bank, that the old sidewalks were one width, dropping down to the street at corners and with steps in between. This will soon be changed. By the way, this old bank has been converted to a beautiful town house for a family that lives in Elba during the week and at their home on Gantt Lake at other times. You can see how they covered some of the large windows with plaster but leaving the arched outlines and the front entrance on the corner which has beautiful patterned glass on sides and over the front door. The old bank vault was torn off at the back and a garage with room overhead was added plus a penthouse on top.
Others have built apartments downtown and more are planned. When the US 84 bypass is completed around Elba, downtown will be a beautiful place to live, work, or to just stroll around and enjoy the park, courthouse square, shops, restaurants, and take walks on the levee trail.
When all of the overhead wires are gone from downtown and new lights installed, it will take on an entire new look. The new coffee house/theater "Just Folk" at the site of the old Claire Theater (next to the Jewel Box which is now closed) is almost finished and I'll post some photos soon of the interior of that beautiful place. I'm going to a concert there one night next week.
Our little town has come a long way since the two floods in the 1990's. The new levee is supposed to protect us for years to come.